Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW 7- STORY, TYPE IA/IIIA, 82- UNIT 100 % AFFORDABLE HOUSING/ DENSITY

Inspection Activity
Date: 11/24/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/24/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/30/2020
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/15/2020
Type: Piling/Pier/Caisson
Result: Approved
Status: Issued
Date: 09/15/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/01/2020
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 06/02/2020
Type: Pre-Inspection
Result: Conditional Approval
Status: Issued
Date: 08/13/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 01/12/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 01/12/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/12/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 09/28/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/06/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/08/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/06/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/08/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/14/2020
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 10/13/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/28/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/29/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/23/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/23/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/22/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/04/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/28/2020
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 11/04/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/05/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/01/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/13/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/10/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/13/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/10/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/19/2020
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 11/16/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/19/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/19/2020
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 11/20/2020
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 11/18/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/17/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/19/2020
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 11/18/2020
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 11/16/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/18/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/17/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/24/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/23/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/23/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/23/2020
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 11/25/2020
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 11/23/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/25/2020
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/25/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/25/2020
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/19/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/03/2020
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 11/30/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/14/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 08/20/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/25/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/04/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/04/2021
Type: Green Building Rough
Result: Partial Approval
Status: Issued
Date: 03/05/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/05/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/04/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/05/2021
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 03/12/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/12/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/12/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/11/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/12/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/10/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/09/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/27/2021
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 08/23/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/24/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 08/25/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 03/16/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 03/15/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/17/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/16/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/17/2021
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/16/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/15/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/15/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/17/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/19/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/27/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/26/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 12/03/2021
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 11/30/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/16/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/15/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/15/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/15/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 08/30/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/10/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/08/2021
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 06/11/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/11/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/11/2021
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 08/30/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 06/18/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 06/14/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/10/2021
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 06/21/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 06/24/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/02/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 12/08/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 07/08/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 09/15/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 07/19/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/24/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 07/27/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/15/2021
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/03/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/16/2021
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 09/29/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 03/07/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 10/04/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/04/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/22/2021
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 12/23/2021
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 12/20/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 10/19/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/21/2021
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 10/19/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/22/2021
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 10/29/2021
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 10/28/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/25/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 10/25/2021
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/29/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 12/29/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 11/09/2021
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/10/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/12/2021
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 12/29/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 11/16/2021
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 11/17/2021
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/16/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/18/2021
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 03/15/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/29/2021
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 01/19/2022
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/20/2022
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 01/24/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 01/27/2022
Type: Interior/Exterior Lathing
Result: Cancelled
Status: Issued
Date: 01/26/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/25/2022
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/01/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/11/2022
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/18/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/30/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/22/2022
Type: Interior/Exterior Lathing
Result: Cancelled
Status: Issued
Date: 02/23/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 02/24/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/15/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/12/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/15/2022
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/28/2022
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 04/28/2022
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 04/28/2022
Type: Final
Result: Cancelled
Status: Issued
Date: 04/28/2022
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 04/28/2022
Type: Interior/Exterior Lathing
Result: Cancelled
Status: Issued
Date: 04/28/2022
Type: Reinforced Masonry Frame
Result: Cancelled
Status: Issued
Date: 04/28/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 04/28/2022
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 04/28/2022
Type: Smoke Detectors
Result: Cancelled
Status: Issued
Date: 05/03/2022
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 09/16/2022
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 09/15/2022
Type: TCO Elevator Verification
Result: Insp Scheduled
Status: Issued
Date: 09/15/2022
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 09/16/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 09/16/2022
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/16/2022
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 09/15/2022
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 09/15/2022
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 09/15/2022
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 09/16/2022
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 09/16/2022
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 09/16/2022
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 07/26/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/26/2022
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 07/28/2022
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 07/27/2022
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 07/27/2022
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 07/27/2022
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 07/29/2022
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 07/27/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 07/27/2022
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 07/28/2022
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 07/26/2022
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 07/26/2022
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 07/26/2022
Type: Final
Result: Partial Inspection
Status: Issued
Date: 07/26/2022
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 07/26/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/26/2022
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 07/26/2022
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 07/27/2022
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 09/22/2022
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 08/01/2022
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 08/02/2022
Type: Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 09/26/2022
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 08/18/2022
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 02/13/2023
Type: Green Building Final
Result: Cancelled
Status: Issued
Date: 02/13/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 02/13/2023
Type: Final
Result: Cancelled
Status: Issued
Date: 02/14/2023
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 05/03/2023
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 05/02/2023
Type: Final
Result: OK to Issue CofO
Status: CofO Issued
Date: 05/03/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/02/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: CofO Issued
Date: 05/02/2023
Type: Green Building Final
Result: Approved
Status: CofO Issued
Date: 05/02/2023
Type: CofO Issuance
Result: CofO in Progress
Status: CofO Issued
Date: 05/03/2023
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
OLSON R D CONSTRUCTION INC

License number: 953845
Type: B
Phone: Speak with a Permit Expert
Location: IRVINE, CA

Permit Applicant

Principal: ROBERT DENNIS OLSON

Type:

Address: 1336 THAYER AVE, LOS ANGELES

Phone:

Experience: years

Applicant: MEE SEMCKEN