Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

CONSTRUCT A NEW 4-STORY APARTMENT, 4 STORIES TYPE IIIA ON 1 STORY TYPE

Inspection Activity
Date: 11/24/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/22/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/21/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/21/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 04/24/2021
Type: Masonry Wall/Backfill
Result: Off-Hour Fees Due
Status: Issued
Date: 04/21/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 04/23/2021
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/24/2021
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/22/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Reinf. Masonry
Result: Insp Cancelled
Status: Issued
Date: 04/23/2021
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 04/23/2021
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 11/23/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/13/2021
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 08/13/2021
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 01/14/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 01/15/2021
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 01/14/2021
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 04/28/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 04/30/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/28/2021
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 04/26/2021
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 01/20/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/19/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/19/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/27/2021
Type: Reinforced Masonry Frame
Result: Cancelled
Status: Issued
Date: 04/27/2021
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 04/29/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/29/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/07/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/10/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 02/10/2021
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 02/12/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/20/2021
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 08/20/2021
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/14/2021
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 05/10/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 05/14/2021
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/11/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/14/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/10/2021
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 05/10/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 02/25/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/25/2021
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/25/2021
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/29/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/02/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/01/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 03/02/2021
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 03/02/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/02/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/03/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 05/17/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 03/12/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/08/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/12/2021
Type: Verify Sprinkler Sign Off
Result: Partial Approval
Status: Issued
Date: 03/11/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 03/12/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 03/08/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/12/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/25/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/25/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/18/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 03/15/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/17/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 08/25/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/26/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/30/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/30/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 12/03/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/30/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/04/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 04/09/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/08/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 04/08/2021
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 04/09/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/04/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/04/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 11/29/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/14/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/15/2021
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 04/12/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/15/2021
Type: Verify Sprinkler Sign Off
Result: Cancelled
Status: Issued
Date: 04/13/2021
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/16/2021
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 08/30/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/30/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/09/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/08/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/10/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/08/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 07/12/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/20/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 07/30/2021
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 07/30/2021
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 07/29/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 09/24/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/17/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/16/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 09/27/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/27/2021
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/28/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/01/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/28/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/23/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/22/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/20/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/21/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/22/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/21/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/27/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/26/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/28/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 10/29/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/10/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 11/12/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/19/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/18/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/17/2021
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/17/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/16/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/21/2022
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 01/27/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/26/2022
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 01/27/2022
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/04/2022
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 02/11/2022
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 02/10/2022
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/15/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 02/14/2022
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 01/20/2023
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 01/19/2023
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 02/17/2023
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 09/27/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 09/27/2023
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 09/27/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 04/26/2023
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 09/25/2023
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 09/28/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 05/05/2023
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 05/03/2023
Type: Wood Frame
Result: Cancelled
Status: Issued
Date: 10/02/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/03/2023
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 10/06/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/02/2023
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 10/10/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/13/2023
Type: Drywall Nailing
Result: Cancelled
Status: Issued
Date: 05/09/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 05/15/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/20/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 06/01/2023
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 06/09/2023
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 10/26/2023
Type: Wall Anchors
Result: Partial Approval
Status: Issued
Date: 06/12/2023
Type: Pre-Inspection
Result: Corrections Issued
Status: Issued
Date: 11/01/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/08/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/13/2023
Type: Drywall Nailing
Result: Corrections Issued
Status: Issued
Date: 07/19/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/21/2023
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 07/26/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 06/20/2024
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/21/2024
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/24/2023
Type: Pre-Inspection
Result: Cancelled
Status: Issued
Date: 09/18/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 07/05/2024
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/24/2024
Type: Interior/Exterior Lathing
Result: Cancelled
Status: Issued
Date: 04/05/2024
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/04/2024
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/16/2024
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 04/18/2024
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 04/24/2024
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 05/02/2024
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
FORMA BUILDERS

License number: 1063990
Type: B
Phone: Speak with a Permit Expert
Location: POWAY, CA

Permit Applicant

Principal: GLENN NATHAN FICK

Type:

Address:

Phone:

Experience: years

Applicant: STEPHEN MONTOYA