Nonbldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

PROPOSED SHORING FOR A 38 STORY HOTEL, RETAIL AND PARKING GARAGE,

Inspection Activity
Date: 11/24/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 12/23/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/23/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/23/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/27/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/25/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/26/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/24/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/23/2020
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 12/23/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/02/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/31/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/01/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/02/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 12/21/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/21/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/22/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/23/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/21/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/21/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/24/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/22/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/22/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/24/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/24/2020
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/23/2020
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/24/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/23/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/21/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/20/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/24/2020
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 04/23/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/22/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 04/22/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/23/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/22/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/28/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/30/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/29/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/29/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/31/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/29/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/31/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/28/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/30/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/28/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/31/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/30/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/21/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/22/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/22/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/21/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/19/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/23/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/23/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/22/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/21/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/13/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/15/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/15/2020
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/12/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/14/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/22/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/21/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/21/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/27/2020
Type: Grading Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 04/23/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/06/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/05/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/07/2020
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/04/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/04/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/04/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/04/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/13/2020
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 02/10/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/14/2020
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 02/12/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 02/11/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 02/18/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/15/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/14/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/16/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/18/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/15/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/17/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/15/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/16/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/17/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/18/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/15/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/28/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 02/28/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/02/2020
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 03/02/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/04/2020
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 03/05/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/06/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/17/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/16/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/17/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/14/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/18/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/13/2020
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 03/13/2020
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/12/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/10/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/10/2020
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/13/2020
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 03/11/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/11/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/11/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/12/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/12/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/11/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/13/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/12/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/10/2020
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 06/12/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/19/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/16/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/20/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/16/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/16/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/18/2020
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/22/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/25/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/24/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/21/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/23/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/24/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/25/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/23/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/21/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/22/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/25/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/24/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/21/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/23/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/24/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/25/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/23/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/21/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/28/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/27/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/26/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/27/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/28/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/26/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/26/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/27/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/30/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/28/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/28/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/29/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/01/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/01/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/30/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/29/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/02/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/01/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/02/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/02/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/28/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/01/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/28/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/30/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/30/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/29/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/28/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/22/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/22/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/22/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/26/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/08/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/07/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/07/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/06/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/07/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/09/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/06/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/06/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/08/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/09/2020
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/09/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/08/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/29/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/27/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/28/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/26/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/26/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/27/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/28/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/27/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/22/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 01/27/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/13/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/13/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/16/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/14/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/16/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/13/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/16/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/15/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/15/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/14/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/14/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/15/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 01/25/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/28/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/28/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/25/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/26/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/26/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/26/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/27/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/28/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/27/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/25/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/23/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/22/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/21/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/23/2020
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/19/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/23/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/23/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/22/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/21/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/19/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/20/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/22/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/21/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/20/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/19/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/20/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/19/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/23/2021
Type: Deputy Fireproofing
Result: Conditional Approval
Status: Issued
Date: 05/06/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/05/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/06/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/28/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/29/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/26/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/28/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/26/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/30/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/29/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/26/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/30/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/29/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/28/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/26/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/30/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/27/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/27/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/30/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/04/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/05/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/03/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/05/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/05/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/04/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/04/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/03/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/03/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/04/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/04/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/06/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/05/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/06/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/05/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/05/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/04/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/02/2020
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 11/05/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/06/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/03/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/03/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/04/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/05/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/06/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/05/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/07/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/06/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/05/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/13/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/12/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/13/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/10/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/09/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/10/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/09/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/13/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/12/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/09/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/10/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/12/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/07/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/06/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/04/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/05/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/03/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/07/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/07/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/05/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/07/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/06/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/09/2021
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 02/10/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/08/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/12/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/12/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/10/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/08/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/11/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/11/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/20/2020
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/20/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 11/16/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/16/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/20/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/16/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/08/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/12/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/11/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/09/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/08/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/12/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/11/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/11/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/12/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/10/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/10/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/25/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/24/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/25/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/24/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/23/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/25/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/23/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/23/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/24/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/25/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/10/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/05/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/07/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/17/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/17/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/04/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/04/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/02/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/01/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/02/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/03/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/04/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/03/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/01/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/03/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/02/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/30/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/01/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/16/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/16/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/17/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/17/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 02/17/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/16/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/07/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/10/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/09/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/09/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/08/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/10/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/10/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/11/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/11/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/09/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/07/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/10/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/09/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/07/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/11/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/08/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/08/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/11/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/08/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/11/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/13/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/11/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 05/10/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/11/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/11/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/10/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/14/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/14/2020
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/18/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/14/2020
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/18/2020
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/18/2020
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/14/2020
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 12/18/2020
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/14/2020
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/10/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/10/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/10/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/11/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/10/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 02/24/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2021
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 03/03/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/19/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/21/2021
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 05/17/2021
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/18/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/18/2021
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/19/2021
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 05/17/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/09/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/10/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/17/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/16/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/16/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/17/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/17/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/16/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/16/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/17/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/17/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/17/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/16/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/19/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/27/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/28/2021
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 03/22/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/22/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/22/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/23/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/26/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/26/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/24/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/26/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/22/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/22/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/26/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/26/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/28/2021
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 04/01/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 03/31/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/31/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/30/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/30/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/30/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/01/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/01/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 03/30/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/01/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/01/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 03/31/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/30/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/31/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/31/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/31/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/02/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 06/04/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/03/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/07/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/05/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/05/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/05/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/05/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/08/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/05/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/09/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/09/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/09/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/09/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/01/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/13/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/13/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 04/13/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/13/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/13/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/15/2021
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/13/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/15/2021
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 06/16/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/14/2021
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 06/16/2021
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 06/18/2021
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/17/2021
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 06/23/2021
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 06/22/2021
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 06/21/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/21/2021
Type: Deputy Pre-Stress Concrete
Result: Partial Approval
Status: Issued
Date: 06/29/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/15/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/21/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/29/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/28/2021
Type: Deputy Reinf. Masonry
Result: Partial Approval
Status: Issued
Date: 07/30/2021
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/29/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/02/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/30/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/29/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/31/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/30/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/02/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/31/2022
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 09/01/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/01/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/16/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/17/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/15/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/14/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/04/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/17/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/16/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/15/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/01/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/21/2022
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/07/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/08/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/08/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/06/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/05/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/07/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/06/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/05/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/27/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/26/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/26/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/26/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 07/08/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 07/07/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/16/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/15/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/16/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/14/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/13/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/14/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/12/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/15/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/13/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/02/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/03/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 09/21/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/23/2022
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/12/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/26/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/30/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 08/17/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/19/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/18/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/19/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/18/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/24/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/24/2022
Type: Deputy Grading
Result: Partial Approval
Status: Issued
Date: 08/26/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/25/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/24/2022
Type: Deputy Other (see comments)
Result: Partial Approval
Status: Issued
Date: 08/23/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/22/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/23/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 08/22/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 10/05/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 10/05/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/03/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/06/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/03/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/03/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/03/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/06/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 01/09/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/10/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/09/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/13/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/14/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/12/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/12/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 10/14/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/12/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/12/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 10/14/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/12/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/12/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 10/13/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 10/14/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/13/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 01/13/2023
Type: Public Counter
Result: Completed
Status: Issued
Date: 10/21/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 10/18/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 10/21/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 10/19/2022
Type: Deputy Steel/Welding
Result: Insp Cancelled
Status: Issued
Date: 10/28/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/02/2023
Type: Final
Result: Conditional Approval
Status: Issued
Date: 02/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Permit Finaled
Date: 02/10/2023
Type: Final
Result: Permit Finaled
Status: Permit Finaled
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
CALEX ENGINEERING COMPANY

License number: 1035841
Type: A
Phone: Speak with a Permit Expert
Location: NEWHALL, CA

Permit Applicant

Principal: RYAN EUGENE SEITZ

Type:

Address:

Phone:

Experience: years

Applicant: TINA HONG