Nonbldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW Retaining /FENCE WALLS (8 TOTAL) 2085 LINEAR FT. 2-6 FT HIGH

Inspection Activity
Date: 12/23/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/22/2020
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 12/21/2020
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 12/21/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/23/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/21/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/23/2020
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/20/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/21/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/23/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/21/2021
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/19/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/22/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/26/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/30/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/28/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/27/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 01/19/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 10/09/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 10/07/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/09/2020
Type: Deputy Wood Construction
Result: Partial Approval
Status: Issued
Date: 10/15/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/14/2020
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 10/14/2020
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/27/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 01/28/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/29/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 01/27/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 10/20/2020
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/05/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/05/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/06/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/04/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/02/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/05/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/11/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/09/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/11/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/10/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 11/17/2020
Type: Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 02/09/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/12/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/18/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/18/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/17/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/17/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/19/2021
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/18/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/19/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/19/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/16/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/18/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/16/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 12/09/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/08/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/11/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/07/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/10/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/12/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/14/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/12/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/13/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/16/2020
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 12/15/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/17/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/16/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/18/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/17/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/14/2020
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 12/18/2020
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 12/17/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/17/2020
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 12/18/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/16/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/14/2020
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 02/22/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/25/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 02/26/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 02/24/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 02/24/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 03/05/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/02/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 03/03/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 03/04/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/17/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 05/18/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 05/19/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 03/12/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/08/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 03/09/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 11/30/2021
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 03/17/2021
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/17/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 03/18/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 03/16/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/27/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/23/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/22/2021
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/31/2021
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 04/01/2021
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/31/2021
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/31/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/01/2021
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 12/02/2021
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 12/02/2021
Type: Masonry Wall
Result: Not Ready for Inspection
Status: Issued
Date: 06/04/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/01/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/06/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/08/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/09/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/07/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/08/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/15/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/12/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/13/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 04/12/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/14/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 04/16/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/16/2021
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/14/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/10/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/09/2021
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 06/08/2021
Type: Deputy Steel/Welding
Result: Partial Approval
Status: Issued
Date: 06/18/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/02/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/01/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/30/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 06/29/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/10/2021
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 12/09/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/07/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/06/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/09/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/08/2021
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/15/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/12/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/14/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/13/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/21/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/19/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/20/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/28/2021
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 07/29/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/16/2021
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/16/2021
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 12/23/2021
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 12/22/2021
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 12/27/2021
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 12/27/2021
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 12/27/2021
Type: Rough
Result: Insp Cancelled
Status: Issued
Date: 05/18/2022
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 05/19/2022
Type: Final
Result: Partial Inspection
Status: Issued
Date: 05/25/2022
Type: Green Building Final
Result: Approved
Status: Permit Finaled
Date: 05/25/2022
Type: Final
Result: Permit Finaled
Status: Permit Finaled
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
OLTMANS CONSTRUCTION CO

License number: 86393
Type: B
Phone: Speak with a Permit Expert
Location: WHITTIER, CA

Permit Applicant

Principal: CHARLES ROBERT ROY

Type:

Address: ., ., .

Phone:

Experience: years

Applicant: ALLAN CATAP