Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW 5-STORY 147 UNITS( with 17 extremely low income units). TYPE III-

Inspection Activity
Date: 06/09/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/09/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/10/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 06/07/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2022
Type: METHANE-Rough
Result: Insp Cancelled
Status: Issued
Date: 06/08/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2022
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 06/09/2022
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/09/2022
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 06/09/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/06/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/07/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2022
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 08/29/2022
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/02/2022
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/29/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/17/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 06/16/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/13/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/13/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/13/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/15/2022
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 03/30/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 03/30/2022
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 03/30/2022
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 03/30/2022
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 06/24/2022
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/04/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 04/04/2022
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 04/04/2022
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 09/08/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/07/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/28/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/28/2022
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 04/21/2022
Type: METHANE-Subgrade
Result: Cancelled
Status: Issued
Date: 04/21/2022
Type: METHANE-Barrier
Result: Cancelled
Status: Issued
Date: 04/21/2022
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 07/01/2022
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/27/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/26/2022
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 07/05/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/05/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/08/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/05/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/05/2022
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2022
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 05/26/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 05/26/2022
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/26/2022
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 12/29/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/03/2022
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/03/2022
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 06/03/2022
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 06/03/2022
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 09/21/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 07/25/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/25/2022
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/26/2022
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 07/28/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/26/2022
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/21/2022
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 09/21/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/12/2023
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 04/13/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/02/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/02/2022
Type: Deputy Pre-Stress Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/02/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/02/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/14/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/14/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/27/2022
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 09/27/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/26/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/27/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/16/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/16/2022
Type: Deputy Pre-Stress Concrete
Result: Conditional Approval
Status: Issued
Date: 09/27/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/25/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/25/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/25/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 10/04/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 01/11/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/11/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 01/12/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 10/20/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/20/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 01/17/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/28/2022
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 10/28/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/24/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 11/04/2022
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 01/26/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/23/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 01/24/2023
Type: Interior/Exterior Lathing
Result: Partial Inspection
Status: Issued
Date: 01/24/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/08/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/16/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/01/2023
Type: Wood Frame
Result: Corrections Issued
Status: Issued
Date: 01/31/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 02/01/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/01/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/01/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 12/01/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 12/09/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/16/2022
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 12/16/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 02/14/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/14/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/21/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/19/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/21/2023
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 04/19/2023
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 04/21/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/20/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 04/21/2023
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 04/28/2023
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 04/25/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/25/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/28/2023
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 04/25/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 04/26/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/04/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/03/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 10/13/2023
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/19/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/16/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/30/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 06/06/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/14/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/20/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/27/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/25/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/17/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/15/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/15/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 11/15/2023
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 11/21/2023
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 08/24/2023
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 11/29/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/05/2023
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/05/2023
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 12/06/2023
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 12/06/2023
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 12/05/2023
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 12/05/2023
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 12/05/2023
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 12/06/2023
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/05/2023
Type: Final
Result: Partial Inspection
Status: Issued
Date: 12/05/2023
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 12/06/2023
Type: Pressure Vessel Verification
Result: CofO on Hold
Status: Issued
Date: 12/06/2023
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 12/05/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 12/05/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/06/2023
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 12/05/2023
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 12/06/2023
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 09/13/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/22/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/30/2024
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 02/02/2024
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 01/31/2024
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 02/01/2024
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 01/30/2024
Type: Final
Result: Partial Inspection
Status: Issued
Date: 01/30/2024
Type: Smoke Detectors
Result: Approved
Status: Issued
Date: 01/30/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 01/30/2024
Type: Green Building Final
Result: Partial Inspection
Status: Issued
Date: 01/29/2024
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 01/30/2024
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/30/2024
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 02/07/2024
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 02/07/2024
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 02/07/2024
Type: TCO PV Verification
Result: Completed (special insp)
Status: Issued
Date: 02/07/2024
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 02/08/2024
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 02/07/2024
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 02/21/2024
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 03/01/2024
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 02/29/2024
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 03/01/2024
Type: TCO Sprinkler Verification
Result: Completed (special insp)
Status: Issued
Date: 03/01/2024
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 04/03/2024
Type: Special/Order Compliance
Result: Insp Cancelled
Status: Issued
Date: 04/02/2024
Type: Green Building Final
Result: Approved
Status: Issued
Date: 04/02/2024
Type: TCO PV Verification
Result: Completed (special insp)
Status: Issued
Date: 04/02/2024
Type: Reinforced Concrete Frame
Result: Approved
Status: Issued
Date: 04/02/2024
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 04/02/2024
Type: Final
Result: Partial Inspection
Status: Issued
Date: 04/02/2024
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 04/02/2024
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 04/02/2024
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 04/12/2024
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 04/11/2024
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 04/24/2024
Type: Electrical Verification
Result: Pending
Status: Issued
Date: 04/23/2024
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 04/24/2024
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 04/24/2024
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Date: 04/24/2024
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 04/23/2024
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 04/29/2024
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 04/30/2024
Type: Electrical Verification
Result: OK for CofO
Status: Issued
Date: 04/30/2024
Type: Grading Verification
Result: OK for CofO
Status: Issued
Date: 04/29/2024
Type: Final
Result: Conditional Approval
Status: Issued
Date: 05/09/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/09/2024
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 05/09/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
STS LA CORP

License number: 990108
Type: B
Phone: Speak with a Permit Expert
Location: SEATTLE, WA

Permit Applicant

Principal: JAMES PORTER EDSON

Type:

Address:

Phone:

Experience: years

Applicant: KIRA MILLER