Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW 3 -STORY CONCRETE TILT-UP BLDG W/ STL FRAME CONSTRUCTION THAT CO

Inspection Activity
Date: 12/20/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/11/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/14/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/12/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/14/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/28/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 12/29/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/27/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/03/2022
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/03/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 04/13/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/27/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 04/12/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/16/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/03/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/09/2023
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 10/13/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/11/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 10/12/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/09/2023
Type: Deputy Steel/Welding
Result: No Access for Inspection
Status: Issued
Date: 01/09/2023
Type: Deputy Steel/Welding
Result: No Access for Inspection
Status: Issued
Date: 10/21/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 01/19/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/19/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/19/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/24/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/25/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/01/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/01/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/26/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/24/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/23/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/25/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/16/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/16/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/16/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 11/17/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 11/22/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/22/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/01/2023
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 02/03/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 02/03/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/03/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 02/03/2023
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 02/01/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/29/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/08/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/12/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/15/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/13/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/07/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/08/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 02/07/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 02/22/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 02/22/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/17/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/16/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/17/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/17/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/16/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/17/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 03/30/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/28/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/28/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/28/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/31/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/17/2023
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 04/17/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/20/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/20/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/17/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/20/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/21/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/17/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/26/2023
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 09/27/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/29/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/27/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 09/29/2023
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 09/27/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/25/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/29/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 09/26/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 04/24/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/26/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 04/27/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/28/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/28/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/04/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/05/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/02/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/03/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/21/2024
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/23/2024
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/04/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/03/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/06/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/05/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/10/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/11/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/12/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/02/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/02/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 05/09/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/10/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/11/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/12/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/30/2024
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 05/09/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/10/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/11/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/12/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/12/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/09/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/10/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/11/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/12/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 05/31/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/30/2024
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/30/2024
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/30/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/17/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/20/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/16/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/17/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/15/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/18/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/18/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/19/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 05/19/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/18/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/18/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/17/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 10/20/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/18/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/17/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/24/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/23/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 05/24/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 05/25/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/25/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/26/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/22/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/18/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/19/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/20/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/16/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/31/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/02/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/31/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/01/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/30/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/30/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/30/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/05/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 06/03/2024
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/05/2024
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/23/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/25/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/27/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/05/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 06/09/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/07/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/06/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/05/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/25/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/23/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 10/23/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 10/23/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/27/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 10/25/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/27/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 10/23/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/24/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 10/24/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/26/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 10/23/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/16/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 06/12/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/15/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/14/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/14/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/13/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/12/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/16/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/14/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/12/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/05/2024
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 06/03/2024
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/20/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/22/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/23/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 06/21/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/21/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/20/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/20/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/30/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/27/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/30/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/27/2023
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 06/27/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/28/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/26/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/27/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 06/29/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 10/31/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/03/2023
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/03/2023
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 10/30/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/03/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/07/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/06/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/05/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/08/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/08/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/13/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/11/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/10/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/12/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/14/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/09/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/06/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/07/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/20/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/18/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/19/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/21/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/28/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 07/27/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/27/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/25/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/26/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 07/24/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/17/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/15/2023
Type: Deputy Steel/Welding
Result: No Access for Inspection
Status: Issued
Date: 11/14/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/13/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/16/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/02/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/03/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/04/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/01/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/01/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 07/31/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/22/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/21/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/10/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/07/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/11/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/09/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/08/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 11/20/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 06/17/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/17/2024
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 06/17/2024
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/17/2024
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/16/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/17/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/14/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/15/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 08/18/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/28/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/30/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/28/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/01/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 11/28/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 11/29/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/25/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/22/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/23/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 08/24/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/27/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 11/30/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/06/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/06/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/06/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/08/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/06/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/05/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/07/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/05/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/05/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/04/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/07/2023
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 12/04/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/07/2023
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 12/08/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/07/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/05/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/08/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/06/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/14/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/12/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/11/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/15/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/13/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/18/2023
Type: Deputy Wood Construction
Result: Insp Scheduled
Status: Issued
Date: 09/18/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/22/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/20/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/22/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 09/19/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/21/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 09/19/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/18/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 09/22/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/15/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/14/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/12/2023
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 12/13/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/11/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/18/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/21/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/22/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/19/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/20/2023
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/27/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/28/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/04/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/02/2024
Type: Deputy Steel/Welding
Result: Approved
Status: Issued
Date: 01/03/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/05/2024
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/10/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/11/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/09/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/12/2024
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/12/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 01/08/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/16/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/19/2024
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 01/19/2024
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/16/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/17/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/18/2024
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 01/16/2024
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/25/2024
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/30/2024
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/29/2024
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 01/29/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/30/2024
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/05/2024
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/27/2024
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2024
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/01/2024
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/29/2024
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/06/2024
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/09/2024
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/09/2024
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/16/2024
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 05/13/2024
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2024
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/13/2024
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/14/2024
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 05/15/2024
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/17/2024
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 05/14/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
XEBEC BUILDING COMPANY INC

License number: 600621
Type: B
Phone: Speak with a Permit Expert
Location: SEAL BEACH, CA

Permit Applicant

Principal: RANDALL RAYMOND KENDRICK

Type:

Address: ., ., .

Phone:

Experience: years

Applicant: SHEAN KIM