Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

(N) 4-STORY TYPE VA 31-UNIT APARTMENT BUILDING 34,386 SF OF R2-OCCUPAN

Inspection Activity
Date: 11/23/2021
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 11/23/2021
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/02/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/29/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/01/2021
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/08/2022
Type: Reinforced Masonry Frame
Result: Partial Inspection
Status: Issued
Date: 06/09/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 06/09/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/09/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/09/2022
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 08/31/2022
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 08/31/2022
Type: Public Counter
Result: Completed
Status: Issued
Date: 03/15/2022
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 08/30/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 06/17/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/15/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 06/17/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/14/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 03/22/2022
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 03/23/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 03/23/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/23/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/24/2022
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 08/30/2022
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 02/16/2022
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 02/16/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/16/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 02/16/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 02/16/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 02/18/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 03/29/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/23/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/06/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/05/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/05/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/05/2022
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 04/07/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/07/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/07/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 04/06/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/06/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 04/05/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 04/06/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/23/2022
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/27/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/18/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/18/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/20/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/14/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/06/2022
Type: Footing/Foundation/Slab
Result: Cancelled
Status: Issued
Date: 05/06/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/14/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/09/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/11/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/16/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/13/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 07/15/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/25/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/23/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/23/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/23/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 04/11/2023
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 12/30/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 06/02/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/27/2022
Type: Insulation
Result: Corrections Issued
Status: Issued
Date: 07/19/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/18/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 07/20/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/20/2022
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 07/20/2022
Type: Special/Order Compliance
Result: Off-Hour Fees Due
Status: Issued
Date: 07/20/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 07/20/2022
Type: Wall Anchors
Result: Insp Cancelled
Status: Issued
Date: 07/18/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/29/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/11/2023
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 04/11/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 04/11/2023
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 01/04/2023
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 09/29/2022
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 08/15/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/26/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/13/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 01/10/2023
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 01/09/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 01/09/2023
Type: Wall Anchors
Result: Partial Approval
Status: Issued
Date: 01/18/2023
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 01/17/2023
Type: Insulation
Result: Insp Cancelled
Status: Issued
Date: 01/17/2023
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 01/17/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/25/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/27/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 01/23/2023
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 01/25/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 01/23/2023
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 01/23/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 01/25/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/07/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 11/07/2022
Type: Wood Frame
Result: No Access for Inspection
Status: Issued
Date: 11/18/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 11/17/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 02/03/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/21/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Cancelled
Status: Issued
Date: 02/03/2023
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 01/30/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/03/2023
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 01/31/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/02/2023
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 01/30/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 02/01/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 02/01/2023
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 02/03/2023
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 12/06/2022
Type: T-Bar Ceiling
Result: Insp Cancelled
Status: Issued
Date: 12/06/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 12/06/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/10/2023
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 02/10/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 02/10/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 12/16/2022
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 02/15/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/24/2024
Type: Plumbing Verification
Result: OK for CofO
Status: CofO in Progress
Date: 05/24/2024
Type: Final
Result: OK to Issue CofO
Status: CofO in Progress
Date: 05/24/2024
Type: Electrical Verification
Result: OK for CofO
Status: CofO in Progress
Date: 05/22/2024
Type: Final
Result: Partial Inspection
Status: CofO in Progress
Date: 05/04/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/04/2023
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2023
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 05/01/2023
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 05/22/2024
Type: Smoke Detectors
Result: Approved
Status: CofO in Progress
Date: 05/24/2024
Type: CofO Issuance
Result: CofO in Progress
Status: CofO in Progress
Date: 05/22/2024
Type: Wood Frame
Result: Approved
Status: CofO in Progress
Date: 05/22/2024
Type: Reinforced Concrete Frame
Result: Approved
Status: CofO in Progress
Date: 05/12/2023
Type: Wall Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Wall Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Wall Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Wall Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/28/2024
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 05/28/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/28/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 05/24/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/23/2023
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 05/23/2023
Type: Wall Anchors
Result: Approved
Status: Issued
Date: 05/23/2023
Type: Structural Steel Frame
Result: Approved
Status: Issued
Date: 05/23/2023
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 06/06/2023
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 06/06/2023
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 06/06/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/12/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/20/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/27/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/14/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/31/2023
Type: Interior/Exterior Lathing
Result: Partial Inspection
Status: Issued
Date: 09/19/2023
Type: Verify Rec and Parks Fee Memo
Result: Not Ready for Inspection
Status: Issued
Date: 09/19/2023
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 01/17/2024
Type: Special/Order Compliance
Result: Partial Approval
Status: Issued
Date: 03/20/2024
Type: Grading Verification
Result: OK for CofO
Status: Issued
Date: 04/05/2024
Type: Elevator Verification
Result: OK for CofO
Status: Issued
Date: 04/22/2024
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 05/02/2024
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2024
Type: Footing/Foundation/Slab
Result: Approved
Status: Issued
Date: 05/02/2024
Type: Final
Result: Corrections Issued
Status: Issued
Date: 05/02/2024
Type: Verify Sprinkler Sign Off
Result: Approved
Status: Issued
Date: 05/02/2024
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/02/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 05/03/2024
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 05/02/2024
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 05/02/2024
Type: Green Building Final
Result: Approved
Status: Issued
Date: 05/02/2024
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 05/08/2024
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/10/2024
Type: Posting Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 05/06/2024
Type: Pre-Inspection
Result: Corrections Issued
Status: Issued
Date: 05/10/2024
Type: Masonry Wall/Backfill
Result: Insp Cancelled
Status: Issued
Date: 05/09/2024
Type: Posting Pre-Inspection
Result: Insp Cancelled
Status: Issued
Date: 05/08/2024
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 05/09/2024
Type: Verify Rec and Parks Fee Memo
Result: Insp Cancelled
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
LUMAR CORPORATION

License number: 1027838
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: BABAK NEHORAY

Type:

Address:

Phone:

Experience: years

Applicant: PETER WILSON