Bldg-Addition Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

CHANGE OF USE & 2 STORY ADDITION TO (E) TWO STORY WAREHOUSE BUILDING

Inspection Activity
Date: 03/01/2022
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/06/2022
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 06/06/2022
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 06/06/2022
Type: METHANE-Subgrade
Result: Insp Cancelled
Status: Issued
Date: 06/06/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/06/2022
Type: METHANE-Barrier
Result: Insp Cancelled
Status: Issued
Date: 06/07/2022
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 01/27/2022
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 01/25/2022
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 01/25/2022
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 01/25/2022
Type: METHANE-Rough
Result: Approved
Status: Issued
Date: 03/21/2022
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/03/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 02/02/2022
Type: Reinforced Masonry Frame
Result: Insp Cancelled
Status: Issued
Date: 02/03/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/11/2022
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 02/14/2022
Type: Grading Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 12/20/2022
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 06/24/2022
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 06/24/2022
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 06/24/2022
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/24/2022
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 09/08/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/28/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/12/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/06/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/13/2022
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 05/13/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/13/2022
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/13/2022
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 09/13/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/18/2022
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/18/2022
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 05/18/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/11/2022
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 07/11/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/11/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 09/13/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/28/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 12/28/2022
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 09/21/2022
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/23/2022
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 09/23/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 09/21/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/29/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 07/29/2022
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 07/25/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/25/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/21/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/12/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/10/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/11/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/08/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 08/11/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 08/17/2022
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/17/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/17/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/30/2022
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 08/23/2022
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 08/23/2022
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/06/2022
Type: Wall Anchors
Result: Cancelled
Status: Issued
Date: 10/04/2022
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 10/13/2022
Type: Wall Anchors
Result: Conditional Approval
Status: Issued
Date: 01/11/2023
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/19/2022
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 10/19/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/19/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 01/19/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/24/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/26/2022
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 10/26/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 10/26/2022
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 10/26/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 10/24/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 11/03/2022
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 11/04/2022
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 11/03/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 11/01/2022
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 01/25/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 11/09/2022
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 11/09/2022
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 11/07/2022
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 11/09/2022
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/16/2022
Type: Masonry Wall/Backfill
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2022
Type: Reinforced Masonry Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2022
Type: T-Bar Ceiling
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2022
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 11/16/2022
Type: Structural Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 11/23/2022
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 11/23/2022
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 02/01/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/01/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/05/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 12/08/2022
Type: Masonry Wall/Backfill
Result: Approved
Status: Issued
Date: 12/08/2022
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 02/14/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/16/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/15/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/15/2023
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/17/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 02/24/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 02/21/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 02/21/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 02/24/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 02/24/2023
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 02/21/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 02/21/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/14/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/13/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/17/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 03/14/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/13/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/13/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/17/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/14/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/14/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/13/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/17/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 03/14/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/13/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/13/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 03/17/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 03/14/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/28/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 04/18/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/20/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/21/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 04/17/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/17/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/17/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/26/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 04/27/2023
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 09/26/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 05/05/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/04/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/05/2023
Type: Light Gage Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 05/05/2023
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 05/05/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 05/04/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/03/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/05/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/11/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/11/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/11/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 10/10/2023
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 10/13/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/11/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/16/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/16/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/16/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/19/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/22/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/23/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 05/31/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/02/2023
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 05/31/2023
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/01/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/01/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/08/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/09/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/09/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/07/2023
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 06/12/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/15/2023
Type: Reinforced Masonry Frame
Result: Partial Approval
Status: Issued
Date: 06/15/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/12/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/13/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 06/13/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/22/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 06/22/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 06/23/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 07/06/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/05/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 07/11/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/20/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 07/25/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/26/2023
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 07/26/2023
Type: Light Gage Steel Frame
Result: Approved
Status: Issued
Date: 11/16/2023
Type: Light Gage Steel Frame
Result: Approved
Status: Issued
Date: 08/10/2023
Type: Light Gage Steel Frame
Result: Approved
Status: Issued
Date: 08/10/2023
Type: Insulation
Result: Approved
Status: Issued
Date: 08/18/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 08/25/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 08/24/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/21/2023
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 08/29/2023
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 08/31/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 08/30/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 08/29/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Approved
Status: Issued
Date: 08/30/2023
Type: Masonry Wall/Backfill
Result: Approved
Status: Issued
Date: 09/07/2023
Type: Reinforced Masonry Frame
Result: Approved
Status: Issued
Date: 09/07/2023
Type: Insulation
Result: Approved
Status: Issued
Date: 09/07/2023
Type: Light Gage Steel Frame
Result: Approved
Status: Issued
Date: 09/07/2023
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 09/12/2023
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 09/18/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 09/18/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 09/21/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 12/14/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/29/2023
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 02/06/2024
Type: Pressure Vessel Verification
Result: CofO on Hold
Status: Issued
Date: 02/07/2024
Type: Special/Order Compliance
Result: Approved
Status: Issued
Date: 02/06/2024
Type: Grading Verification
Result: CofO on Hold
Status: Issued
Date: 02/06/2024
Type: AIM Verification
Result: Not Applicable
Status: Issued
Date: 02/16/2024
Type: Special/Order Compliance
Result: Insp Scheduled
Status: Issued
Date: 02/23/2024
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 02/23/2024
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 02/20/2024
Type: Special/Order Compliance
Result: Not Ready for Inspection
Status: Issued
Date: 02/23/2024
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 02/23/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 02/23/2024
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 03/06/2024
Type: Green Building Final
Result: Partial Approval
Status: Issued
Date: 03/06/2024
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 03/06/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Approved
Status: Issued
Date: 03/29/2024
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 03/29/2024
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 04/10/2024
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/11/2024
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 04/18/2024
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/15/2024
Type: Drywall Nailing
Result: Approved
Status: Issued
Date: 05/10/2024
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 05/10/2024
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 05/15/2024
Type: Special/Order Compliance
Result: No Access for Inspection
Status: Issued
Date: 05/13/2024
Type: Elevator Verification
Result: Cancelled
Status: Issued
Date: 05/13/2024
Type: TCO Heat,Vent,A/C Verification
Result: Completed (special insp)
Status: Issued
Date: 05/13/2024
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 05/13/2024
Type: Grading Verification
Result: OK for CofO
Status: Issued
Date: 05/13/2024
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 05/13/2024
Type: TCO Grading Verification
Result: Completed (special insp)
Status: Issued
Date: 05/13/2024
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 05/16/2024
Type: Special/Order Compliance
Result: No Access for Inspection
Status: Issued
Date: 05/14/2024
Type: Final
Result: OK for TCO
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
BENCHMARK CONTRACTORS INC

License number: 462263
Type: B
Phone: Speak with a Permit Expert
Location: SANTA MONICA, CA

Permit Applicant

Principal: RON ELAZAR

Type:

Address: ., ., .

Phone:

Experience: years

Applicant: CASON HALL