Bldg-Alter/Repair Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

Seismic Upgrade to comply with NDC ordinance (NDC-572), Interiorr bat

Inspection Activity
Date: 03/01/2022
Type: Deputy Grading
Result: Conditional Approval
Status: Issued
Date: 06/10/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 06/08/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 06/08/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 06/09/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 06/06/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/09/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/07/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/06/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/07/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/10/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/11/2022
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/10/2022
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/11/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/10/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/07/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/08/2022
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 03/11/2022
Type: Deputy Grading
Result: Insp Scheduled
Status: Issued
Date: 03/09/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/09/2022
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 06/09/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 06/10/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 09/02/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 08/30/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 09/01/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 03/14/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 03/16/2022
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 03/14/2022
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 03/17/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/16/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 03/15/2022
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 03/17/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/16/2022
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 03/15/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 03/25/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/22/2022
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 08/31/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 12/20/2022
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 12/21/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/23/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/22/2022
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/21/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/19/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 03/29/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/29/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/31/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 03/31/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/20/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/21/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/23/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/22/2022
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 12/19/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/23/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/20/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/22/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/24/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/23/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/22/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/24/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/06/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 04/05/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/06/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/05/2022
Type: Reinforced Concrete Frame
Result: Partial Inspection
Status: Issued
Date: 04/06/2022
Type: Deputy Reinf. Concrete
Result: Approved
Status: Issued
Date: 04/05/2022
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/04/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/05/2022
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 06/22/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/23/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/21/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/23/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/08/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/09/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/09/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/08/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/09/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 09/08/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/08/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/08/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/08/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/30/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/27/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/19/2022
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 06/30/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/28/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/29/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/01/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 06/28/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/27/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/29/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/01/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 04/29/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/29/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/29/2022
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/29/2022
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 04/29/2022
Type: Deputy Other (see comments)
Result: Insp Scheduled
Status: Issued
Date: 12/19/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 12/21/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/21/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/22/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/22/2022
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 12/20/2022
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 04/10/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/05/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/08/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 05/04/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/03/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/04/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/03/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/05/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/02/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/05/2022
Type: Deputy Steel/Welding
Result: Conditional Approval
Status: Issued
Date: 05/03/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/02/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/06/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/05/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/06/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/08/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/10/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/16/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 09/16/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 09/15/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/12/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/16/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 09/13/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/13/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/12/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/16/2022
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 09/13/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/15/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/15/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/18/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/17/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/19/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/17/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/19/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/18/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/20/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/16/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/16/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/19/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/16/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/18/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/17/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/15/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/12/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/11/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/11/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/12/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/15/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/12/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/11/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 05/27/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/23/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/24/2022
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 05/27/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/23/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/26/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/24/2022
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 05/24/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 05/24/2022
Type: Deputy Shotcrete
Result: Approved
Status: Issued
Date: 05/25/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 05/25/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/26/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/13/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/14/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/14/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/15/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/12/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/02/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/02/2022
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 06/03/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/02/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/02/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/31/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/02/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 06/03/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 05/31/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/01/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 06/01/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 06/02/2022
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 12/30/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/19/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/18/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/19/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/19/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/20/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/21/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/20/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/21/2022
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 07/21/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/20/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/22/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/22/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/21/2022
Type: Pre-Inspection
Result: Approved
Status: Issued
Date: 07/21/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/18/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/22/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/18/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/30/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/27/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/29/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/29/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/27/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/22/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 09/22/2022
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 09/21/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/29/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/29/2022
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 07/28/2022
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 07/28/2022
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 07/26/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/29/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/25/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/29/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/25/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/26/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 07/29/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 07/29/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/28/2022
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 07/29/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 07/25/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/29/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 07/27/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/27/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/26/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/27/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/23/2022
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 09/21/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/23/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 09/19/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/21/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/20/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/23/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 09/22/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 09/20/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/20/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/01/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/04/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/04/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/01/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/03/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/01/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/02/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/05/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/04/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/03/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/01/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/03/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/05/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/02/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/05/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/05/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/02/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/05/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/04/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/05/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/06/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/05/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/04/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/03/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/03/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/05/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/04/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/04/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/03/2023
Type: Deputy Drilled-In Anchors
Result: No Access for Inspection
Status: Issued
Date: 01/06/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/28/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/26/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 09/28/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/11/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/09/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/12/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/11/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/09/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/10/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/12/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 08/10/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 08/08/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/12/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/09/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/08/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/08/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/12/2022
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 08/10/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/11/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/28/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/28/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/28/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/26/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 09/28/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/26/2022
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 09/28/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 09/28/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/28/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/16/2022
Type: Reinforced Concrete Frame
Result: Cancelled
Status: Issued
Date: 08/16/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 08/17/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/15/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/16/2022
Type: Green Building Rough
Result: Cancelled
Status: Issued
Date: 08/16/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 01/04/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/05/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/03/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/03/2023
Type: Deputy Shotcrete
Result: No Access for Inspection
Status: Issued
Date: 01/06/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/25/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/25/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/22/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/26/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 08/24/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/22/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/23/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/22/2022
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 08/23/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/23/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/25/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/26/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/22/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 08/24/2022
Type: Deputy Drilled-In Anchors
Result: Approved
Status: Issued
Date: 08/26/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/24/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/22/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/22/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/07/2022
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 10/07/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/07/2022
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 01/12/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/10/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/11/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/09/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/11/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/12/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/09/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/13/2023
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 01/13/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 01/11/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/13/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 10/13/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/13/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/12/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 10/13/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/14/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/13/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 01/10/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/12/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/10/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/09/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 10/19/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 10/20/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 10/19/2022
Type: Deputy Drilled-In Anchors
Result: Insp Cancelled
Status: Issued
Date: 01/19/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/20/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/20/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/19/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/18/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/17/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/18/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/20/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/17/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 01/17/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 01/19/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/17/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/19/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/18/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/17/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/17/2023
Type: Piling/Pier/Caisson
Result: Partial Inspection
Status: Issued
Date: 10/28/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 10/27/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2022
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 10/27/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/24/2022
Type: Deputy Shotcrete
Result: Insp Cancelled
Status: Issued
Date: 10/27/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/02/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/24/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/23/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/26/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/25/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/27/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/26/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/23/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/26/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/25/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/24/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/27/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/24/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/27/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/23/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/10/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/07/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/07/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/09/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/27/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/25/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/26/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/18/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/17/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 11/17/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/15/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/17/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/14/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/15/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/18/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/17/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/15/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/18/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/17/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/03/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 01/31/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/22/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/22/2022
Type: Structural Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 11/21/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/22/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/21/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/21/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 11/22/2022
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 11/21/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/22/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/22/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/01/2023
Type: Deputy Shotcrete
Result: Partial Approval
Status: Issued
Date: 02/03/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/30/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/01/2023
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 02/03/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/03/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/30/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/31/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/03/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/31/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 01/30/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/03/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/01/2023
Type: Deputy Drilled-In Anchors
Result: Partial Approval
Status: Issued
Date: 12/09/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/07/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/08/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/06/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/06/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/08/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/09/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/07/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/09/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/10/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/09/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/08/2023
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 02/09/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/06/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/10/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/09/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/09/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/14/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/16/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 12/14/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/12/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/12/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/13/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/15/2022
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 12/13/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/16/2022
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/15/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/09/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/06/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/09/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/10/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/10/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/09/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/06/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/14/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/17/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/13/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/13/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/13/2023
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 02/13/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/15/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/14/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/21/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/21/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/24/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/23/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/22/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/23/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/24/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/22/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 02/23/2023
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/15/2023
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 03/15/2023
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/15/2023
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 03/15/2023
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/29/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/29/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/29/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/29/2023
Type: Structural Steel Frame
Result: Partial Approval
Status: Issued
Date: 03/30/2023
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 04/18/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 04/18/2023
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 05/21/2024
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/02/2023
Type: Footing/Foundation/Slab
Result: Corrections Issued
Status: Issued
Date: 05/02/2023
Type: Light Gage Steel Frame
Result: Corrections Issued
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/12/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/09/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 05/15/2023
Type: Green Building Final
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2023
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2023
Type: Final
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2023
Type: Smoke Detectors
Result: Not Ready for Inspection
Status: Issued
Date: 05/17/2023
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 05/15/2023
Type: SGSOV-Seismic Gas S/O Valve
Result: SGSOV Not Ready
Status: Issued
Date: 05/15/2023
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 06/06/2024
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/22/2023
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 06/26/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/25/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/26/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 07/24/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 08/22/2023
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/04/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 06/28/2024
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 12/15/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 12/15/2023
Type: Structural Steel Frame
Result: Insp Cancelled
Status: Issued
Date: 12/12/2023
Type: Deputy Steel/Welding
Result: Insp Scheduled
Status: Issued
Date: 12/22/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/18/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 12/18/2023
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 07/01/2024
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/01/2024
Type: Insulation
Result: Not Ready for Inspection
Status: Issued
Date: 01/17/2024
Type: Reinforced Concrete Frame
Result: Partial Approval
Status: Issued
Date: 01/24/2024
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 01/24/2024
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 01/24/2024
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 02/09/2024
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 02/23/2024
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 03/13/2024
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 03/12/2024
Type: Public Counter
Result: Completed
Status: Issued
Date: 03/12/2024
Type: Deputy Drilled-In Anchors
Result: Conditional Approval
Status: Issued
Date: 03/13/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Cancelled
Status: Issued
Date: 03/15/2024
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 03/20/2024
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 03/20/2024
Type: Structural Steel Frame
Result: Corrections Issued
Status: Issued
Date: 04/12/2024
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 04/12/2024
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 04/12/2024
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/15/2024
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 04/15/2024
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 04/19/2024
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 04/15/2024
Type: Insulation
Result: Cancelled
Status: Issued
Date: 05/07/2024
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 05/07/2024
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 05/07/2024
Type: Insulation
Result: Partial Inspection
Status: Issued
Date: 05/13/2024
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
ONNI CONTRACTING (CALIFORNIA) INC

License number: 976929
Type: B
Phone: Speak with a Permit Expert
Location: LOS ANGELES, CA

Permit Applicant

Principal: APRIANO MEOLA

Type:

Address:

Phone:

Experience: years

Applicant: BEN SPECTOR