Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

New 4-story, 46-unit, 100% affordable housing apartment with 4 stories

Inspection Activity
Date: 09/01/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/01/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/01/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/02/2022
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 08/30/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 09/01/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/01/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/30/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 08/29/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/02/2022
Type: Deputy Shotcrete
Result: Insp Scheduled
Status: Issued
Date: 09/02/2022
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 08/29/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/01/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 09/01/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/19/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/20/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/20/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/09/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/09/2022
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/09/2022
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 09/09/2022
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 09/09/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/09/2022
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/06/2022
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/07/2022
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/06/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/09/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/09/2022
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 09/09/2022
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 09/09/2022
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 12/21/2022
Type: Footing/Foundation/Slab
Result: Insp Cancelled
Status: Issued
Date: 12/21/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 12/21/2022
Type: Deputy Shotcrete
Result: Conditional Approval
Status: Issued
Date: 07/07/2022
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 07/07/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/07/2022
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 04/11/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 07/15/2022
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 07/15/2022
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 07/15/2022
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 12/30/2022
Type: Structural Steel Frame
Result: Partial Inspection
Status: Issued
Date: 04/11/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 07/25/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 07/26/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 07/26/2022
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 07/26/2022
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 04/11/2023
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 04/11/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 08/02/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/04/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 08/05/2022
Type: Pre-Inspection
Result: Partial Approval
Status: Issued
Date: 08/05/2022
Type: Public Counter
Result: Completed
Status: Issued
Date: 08/03/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/05/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/04/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/11/2023
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 08/12/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/08/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/11/2022
Type: METHANE-Subgrade
Result: Not Ready for Inspection
Status: Issued
Date: 08/11/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 08/10/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 08/11/2022
Type: METHANE-Barrier
Result: Not Ready for Inspection
Status: Issued
Date: 08/11/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/10/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/09/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/12/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 08/12/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/16/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/16/2022
Type: Piling/Pier/Caisson
Result: Partial Approval
Status: Issued
Date: 08/17/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/15/2022
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/15/2022
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 08/15/2022
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 08/19/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/15/2022
Type: Deputy Reinf. Concrete
Result: Partial Approval
Status: Issued
Date: 08/15/2022
Type: Reinforced Concrete Frame
Result: Not Ready for Inspection
Status: Issued
Date: 08/18/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/25/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 08/26/2022
Type: METHANE-Barrier
Result: Insp Scheduled
Status: Issued
Date: 08/26/2022
Type: METHANE-Subgrade
Result: Insp Scheduled
Status: Issued
Date: 08/26/2022
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 08/26/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/23/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/24/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 08/25/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 08/22/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/05/2022
Type: METHANE-Subgrade
Result: Partial Inspection
Status: Issued
Date: 01/10/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 01/12/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 01/11/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 01/18/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 01/17/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2022
Type: METHANE-Subgrade
Result: Approved
Status: Issued
Date: 10/28/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 10/27/2022
Type: METHANE-Barrier
Result: Approved
Status: Issued
Date: 10/27/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 11/03/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/03/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/04/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 01/24/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 11/10/2022
Type: METHANE-Rough
Result: Insp Scheduled
Status: Issued
Date: 11/14/2022
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 11/16/2022
Type: METHANE-Rough
Result: Not Ready for Inspection
Status: Issued
Date: 11/15/2022
Type: Deputy Other (see comments)
Result: Conditional Approval
Status: Issued
Date: 11/15/2022
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 01/30/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/23/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/22/2022
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 11/28/2022
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/02/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 11/30/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/01/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/05/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/08/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/07/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/09/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/06/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/06/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/10/2023
Type: Deputy Methane Barrier
Result: Conditional Approval
Status: Issued
Date: 02/08/2023
Type: Deputy Drilled-In Anchors
Result: Insp Scheduled
Status: Issued
Date: 02/08/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 02/08/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 12/14/2022
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 12/16/2022
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/15/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/16/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/14/2022
Type: METHANE-Rough
Result: Insp Cancelled
Status: Issued
Date: 12/16/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/13/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/14/2022
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 12/14/2022
Type: Reinforced Concrete Frame
Result: Insp Cancelled
Status: Issued
Date: 12/12/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/13/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/14/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/14/2022
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/13/2022
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 12/16/2022
Type: Deputy Reinf. Concrete
Result: Insp Cancelled
Status: Issued
Date: 02/06/2023
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 02/16/2023
Type: Footing/Foundation/Slab
Result: Partial Approval
Status: Issued
Date: 02/17/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 02/15/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 02/16/2023
Type: METHANE-Rough
Result: Partial Approval
Status: Issued
Date: 02/22/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/13/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 03/14/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/13/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 03/14/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/29/2023
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 03/29/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/29/2023
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 09/27/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/28/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/27/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/27/2023
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 09/28/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 04/27/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/28/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 04/24/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/04/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/04/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 10/04/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 10/06/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 05/08/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/02/2023
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 05/08/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/08/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/08/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/29/2024
Type: Special/Order Compliance
Result: Conditional Approval
Status: Issued
Date: 05/19/2023
Type: Interior/Exterior Lathing
Result: Insp Scheduled
Status: Issued
Date: 05/18/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 05/15/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 10/17/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 05/25/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 05/26/2023
Type: Light Gage Steel Frame
Result: Cancelled
Status: Issued
Date: 05/31/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 05/30/2023
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 06/01/2023
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/07/2024
Type: Wood Frame
Result: Insp Scheduled
Status: Issued
Date: 06/07/2024
Type: Reinforced Concrete Frame
Result: Insp Scheduled
Status: Issued
Date: 06/07/2024
Type: SGSOV-Seismic Gas S/O Valve
Result: Insp Scheduled
Status: Issued
Date: 06/07/2024
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 06/06/2023
Type: Interior/Exterior Lathing
Result: Partial Approval
Status: Issued
Date: 06/09/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 06/09/2023
Type: Deputy Methane Barrier
Result: Insp Scheduled
Status: Issued
Date: 06/09/2023
Type: T-Bar Ceiling
Result: Insp Scheduled
Status: Issued
Date: 06/07/2024
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 06/12/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/14/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/07/2024
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 06/07/2024
Type: Final
Result: Insp Scheduled
Status: Issued
Date: 06/07/2024
Type: Smoke Detectors
Result: Insp Scheduled
Status: Issued
Date: 06/07/2024
Type: Green Building Final
Result: Insp Scheduled
Status: Issued
Date: 06/07/2024
Type: Footing/Foundation/Slab
Result: Insp Scheduled
Status: Issued
Date: 06/21/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/20/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 06/30/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 06/26/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/30/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 06/26/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/11/2023
Type: Light Gage Steel Frame
Result: Partial Approval
Status: Issued
Date: 07/11/2023
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 07/13/2023
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 07/11/2023
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 06/11/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 06/11/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Issued
Date: 07/20/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 06/11/2024
Type: CofO Issuance
Result: CofO Issued
Status: CofO Issued
Date: 07/25/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 07/25/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/25/2023
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 08/02/2023
Type: Green Building Rough
Result: Approved
Status: Issued
Date: 08/02/2023
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 08/08/2023
Type: T-Bar Ceiling
Result: Partial Approval
Status: Issued
Date: 08/31/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/01/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 12/07/2023
Type: Fire Sprinkler Verification
Result: CofO on Hold
Status: Issued
Date: 12/07/2023
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 09/05/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/06/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/08/2023
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 12/07/2023
Type: Elevator Verification
Result: CofO on Hold
Status: Issued
Date: 12/07/2023
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 12/07/2023
Type: Pressure Vessel Verification
Result: CofO on Hold
Status: Issued
Date: 12/07/2023
Type: Plumbing Verification
Result: CofO on Hold
Status: Issued
Date: 12/07/2023
Type: Heat,Vent,A/C Verification
Result: CofO on Hold
Status: Issued
Date: 12/07/2023
Type: Grading Verification
Result: Insp Scheduled
Status: Issued
Date: 09/11/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/13/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 09/14/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/20/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/21/2023
Type: Footing/Foundation/Slab
Result: Not Ready for Inspection
Status: Issued
Date: 12/22/2023
Type: TCO Heat,Vent,A/C Verification
Result: Insp Scheduled
Status: Issued
Date: 12/22/2023
Type: TCO Electrical Verification
Result: Completed (special insp)
Status: Issued
Date: 12/20/2023
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 12/22/2023
Type: TCO Grading Verification
Result: Insp Scheduled
Status: Issued
Date: 12/22/2023
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 12/22/2023
Type: TCO PV Verification
Result: Completed (special insp)
Status: Issued
Date: 07/03/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Corrected
Date: 07/03/2024
Type: CofO Issuance
Result: CofO Corrected
Status: CofO Corrected
Date: 12/27/2023
Type: Verify Sprinkler Sign Off
Result: Insp Cancelled
Status: Issued
Date: 12/29/2023
Type: TCO Plumbing Verification
Result: Completed (special insp)
Status: Issued
Date: 12/26/2023
Type: TCO Elevator Verification
Result: Completed (special insp)
Status: Issued
Date: 12/30/2023
Type: Special/Order Compliance
Result: Pending Review
Status: Issued
Date: 07/03/2024
Type: Inspection
Result: Permit Finaled
Status: CofO Corrected
Date: 02/06/2024
Type: Pressure Vessel Verification
Result: OK for CofO
Status: Issued
Date: 02/06/2024
Type: Heat,Vent,A/C Verification
Result: OK for CofO
Status: Issued
Date: 02/05/2024
Type: Grading Verification
Result: OK for CofO
Status: Issued
Date: 02/06/2024
Type: Electrical Verification
Result: CofO on Hold
Status: Issued
Date: 02/06/2024
Type: Plumbing Verification
Result: OK for CofO
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
WESTPORT CONSTRUCTION INC

License number: 712732
Type: B
Phone: Speak with a Permit Expert
Location: MONROVIA, CA

Permit Applicant

Principal: RAYMOND ERNEST APODACA

Type:

Address: 21600 OXNARD ST, STE 630, WOODLAND HILLS

Phone:

Experience: years

Applicant: CHRISTOPHER MURRAY