Bldg-New Permit

Permit Type: New Construction Permit

Work Category: 1 or 2 Family Dwellin

PCIS Permit#: 22014-10000-04294

Status: Issued on 10/11/2023

Status Date: 03/04/2015

Work Description:
STE 3100 Non-Structural Interior office tile work includes non-structure includes non-structure.

Address: 12310 1st Helena, Los Angeles, 90049

Property Identifier: Block: 1, Lot: 12, Zone: RS-1

Assessor Information: Book: 7449, Page: 14, Parcel:

Geo Info:Tract: TR 5462, Census Tract: 2640

Popular Projects Nearby

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Inspection Activity 3

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
PCIS Permit#: Date:
03/04/2015
Status:
Permit Finaled
Result:
Approved
Work Description

NEW 145'4" X 212'11" 5 STORY TOTAL 4 LEVELS 149 UNITS APARTMENT TYPE

Inspection Activity
Date: 09/29/2023
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 09/25/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/29/2023
Type: Masonry Wall/Backfill
Result: Insp Scheduled
Status: Issued
Date: 09/27/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 09/26/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/28/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 09/27/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/25/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/27/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/28/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/27/2023
Type: Pre-Inspection
Result: Partial Inspection
Status: Issued
Date: 09/29/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/29/2023
Type: Reinforced Masonry Frame
Result: Insp Scheduled
Status: Issued
Date: 09/29/2023
Type: Verify Sprinkler Sign Off
Result: Insp Scheduled
Status: Issued
Date: 05/21/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/21/2024
Type: Insulation
Result: Insp Cancelled
Status: Issued
Date: 05/19/2023
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 05/19/2023
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 10/20/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 10/19/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/03/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 06/04/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 10/26/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 10/24/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 10/25/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 06/12/2023
Type: Pre-Inspection
Result: Corrections Issued
Status: Issued
Date: 06/05/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 06/07/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 06/21/2023
Type: AIM Verification
Result: Not Applicable
Status: Issued
Date: 11/03/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 11/04/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Off-Hour Fees Due
Status: Issued
Date: 11/03/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 11/02/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 06/14/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 11/09/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 11/07/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 11/08/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 11/06/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/09/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 07/20/2023
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 07/20/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/13/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 11/13/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 07/24/2023
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 07/26/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 11/14/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 08/04/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Corrections Issued
Status: Issued
Date: 08/05/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 08/11/2023
Type: Pre-Inspection
Result: Insp Scheduled
Status: Issued
Date: 08/08/2023
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 08/09/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Not Ready for Inspection
Status: Issued
Date: 08/10/2023
Type: Footing/Foundation/Slab
Result: Partial Inspection
Status: Issued
Date: 11/20/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 06/21/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 06/20/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 08/28/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 09/01/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/01/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 09/05/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/07/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/06/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/06/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 09/05/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 09/07/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 12/08/2023
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 09/11/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 09/14/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/14/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/12/2023
Type: Masonry Wall/Backfill
Result: Partial Inspection
Status: Issued
Date: 09/15/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/12/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Inspection
Status: Issued
Date: 09/12/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 06/27/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 09/19/2023
Type: Masonry Wall/Backfill
Result: Partial Approval
Status: Issued
Date: 09/18/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/19/2023
Type: Deputy Reinf. Masonry
Result: Approved
Status: Issued
Date: 09/22/2023
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Scheduled
Status: Issued
Date: 09/22/2023
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 09/22/2023
Type: Deputy Reinf. Masonry
Result: Insp Scheduled
Status: Issued
Date: 09/20/2023
Type: Deputy Reinf. Masonry
Result: Conditional Approval
Status: Issued
Date: 12/12/2023
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 12/14/2023
Type: Light Gage Steel Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/14/2023
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 12/12/2023
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 06/24/2024
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/19/2023
Type: Verify Sprinkler Sign Off
Result: Not Ready for Inspection
Status: Issued
Date: 12/19/2023
Type: Wood Frame
Result: Not Ready for Inspection
Status: Issued
Date: 12/20/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 12/20/2023
Type: Deputy Wood Construction
Result: Conditional Approval
Status: Issued
Date: 12/19/2023
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 12/19/2023
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 07/02/2024
Type: Wood Frame
Result: Corrections Issued
Status: Issued
Date: 07/03/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 07/02/2024
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 12/27/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 12/28/2023
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 12/28/2023
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 12/28/2023
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 07/05/2024
Type: Insulation
Result: Insp Scheduled
Status: Issued
Date: 07/03/2024
Type: Insulation
Result: Partial Approval
Status: Issued
Date: 01/09/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 01/09/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 01/11/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 01/11/2024
Type: Special/Order Compliance
Result: Partial Inspection
Status: Issued
Date: 01/17/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 01/19/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 01/18/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 01/22/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 01/25/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 02/02/2024
Type: Drywall Nailing
Result: Insp Scheduled
Status: Issued
Date: 01/29/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 01/31/2024
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Date: 02/02/2024
Type: Green Building Rough
Result: Insp Scheduled
Status: Issued
Date: 02/02/2024
Type: Light Gage Steel Frame
Result: Insp Scheduled
Status: Issued
Date: 01/31/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 02/09/2024
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/08/2024
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 02/06/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 02/08/2024
Type: Grading Pre-Inspection
Result: Not Ready for Inspection
Status: Issued
Date: 02/07/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 02/09/2024
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 02/16/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2024
Type: Drywall Nailing
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2024
Type: Interior/Exterior Lathing
Result: Not Ready for Inspection
Status: Issued
Date: 02/14/2024
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/13/2024
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 02/13/2024
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 02/20/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Inspection
Status: Issued
Date: 02/21/2024
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/20/2024
Type: Light Gage Steel Frame
Result: Partial Inspection
Status: Issued
Date: 02/22/2024
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 02/23/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 02/22/2024
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 02/20/2024
Type: Drywall Nailing
Result: Partial Inspection
Status: Issued
Date: 02/26/2024
Type: Special/Order Compliance
Result: Corrections Issued
Status: Issued
Date: 02/28/2024
Type: Wall Anchors
Result: Not Ready for Inspection
Status: Issued
Date: 02/27/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 03/01/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 03/06/2024
Type: Wood Frame
Result: Partial Approval
Status: Issued
Date: 03/04/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/06/2024
Type: Green Building Rough
Result: Partial Inspection
Status: Issued
Date: 03/06/2024
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 03/06/2024
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/18/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 03/21/2024
Type: Drywall Nailing
Result: Partial Approval
Status: Issued
Date: 03/21/2024
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 03/22/2024
Type: Drywall Nailing
Result: Insp Cancelled
Status: Issued
Date: 03/19/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Corrections Issued
Status: Issued
Date: 03/20/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 03/22/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 03/22/2024
Type: Green Building Rough
Result: Insp Cancelled
Status: Issued
Date: 03/29/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Insp Cancelled
Status: Issued
Date: 03/27/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 03/29/2024
Type: Deputy Reinf. Concrete
Result: Insp Scheduled
Status: Issued
Date: 04/03/2024
Type: Excavation/Setback/Form/Re-Bar
Result: Partial Approval
Status: Issued
Date: 04/03/2024
Type: Deputy Reinf. Concrete
Result: Conditional Approval
Status: Issued
Date: 04/05/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 04/08/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/09/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 04/19/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Scheduled
Status: Issued
Date: 04/16/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 04/17/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Not Ready for Inspection
Status: Issued
Date: 05/16/2024
Type: Green Building Rough
Result: Not Ready for Inspection
Status: Issued
Date: 05/14/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Insp Cancelled
Status: Issued
Date: 05/13/2024
Type: Floor/Roof Diaphrgm/Shear Wall
Result: Partial Approval
Status: Issued
Date: 05/16/2024
Type: Verify Sprinkler Sign Off
Result: Partial Inspection
Status: Issued
Date: 05/16/2024
Type: Wood Frame
Result: Partial Inspection
Status: Issued
Permit Expediting Services

Fast-track your permit approval process with our specialized expediting services tailored to your needs.

Request a Quote

Ready to get started? Get a personalized estimate for your project.

Get Your Quote
Contractor Info
WESTPORT CONSTRUCTION INC

License number: 712732
Type: B
Phone: Speak with a Permit Expert
Location: MONROVIA, CA

Permit Applicant

Principal: RAYMOND ERNEST APODACA

Type:

Address: 6912 OWENSMOUTN AV, STE 100, C P , CA

Phone:

Experience: years

Applicant: ERWIN CRUZ